There’s usually a lot going on when a business takes over a commercial property. Staff are getting settled, equipment needs moving, suppliers need updating, and someone’s probably already talking about what should be upgraded. Meanwhile, the building itself still needs looking after. That’s where things can get messy. A maintenance contract might be close to expiring. The previous owner might have left a few jobs unfinished, or the heating system could have a problem that only becomes obvious once the building is being used every day. And all of this is much easier to deal with when there’s a clear picture of what’s happening on site.
The first 30 days are a good time to get that picture. Not to fix everything or start changing things for the sake of it. Just to work out what’s there, what’s working and what needs attention.
First Week: A Few Things Need Checking Straight Away
Start with access to the building. Who has keys? Are the alarm codes current and valid? Does the security firm have the correct contact information? Take care of any access that previous workers or contractors may still have. Next, discuss fire safety. Examine the fire doors, escape routes, emergency lighting, and alarm. Check to see whether anything is past due by obtaining the inspection records. Instead of putting a system on the list for another week to be tested, schedule it. Although it may seem like simple housekeeping, when everyone is preoccupied with the takeover, these are the things that might be overlooked. Make sure the people responsible for the site know where to find them. Nobody wants to be figuring that out halfway through a leak.
Insurance needs a look as well. If the property will be used differently under the new owner, check whether the existing policy still covers the operation. The same applies if there’s new machinery, additional stock or a change in occupancy.
Week Two: Get Out There and Look Around
This is the part that’s easy to rush. Someone might have inspected the property before the purchase, but that doesn’t mean every maintenance issue has been picked up. Walk the site again, this time with the people responsible for keeping it running. Check the loading bays, drainage, roof, heating and ventilation systems. Have a look at the plant rooms, electrical installations and areas where equipment gets heavy use. Ask about anything that looks worn or hasn’t been serviced recently. A loading door that occasionally jams, for instance, might not seem urgent when the site is quiet. Once deliveries start arriving throughout the day, it’s a different story.
Keep notes as you go. A photograph and a short description are usually enough to get a maintenance job started. If the cause isn’t obvious, bring in someone qualified to inspect it. There’s no need to fix every little thing immediately. Some issues need attention now while others can wait until there’s a better idea of the budget.
Health and safety should be checked at the same time. Make sure the risk assessments reflect the work actually happening on site, not just the way the previous owner used the building.
Week Three: Find Out What’s Been Going On
The people already working at the facility can often tell you things that won’t show up in the record. The maintenance team might know that a particular machine keeps breaking down. The cleaning staff might have been dealing with the same problem for months. The facilities manager might have a list of repairs that never got approved. Ask them. It doesn’t have to be a formal exercise. A conversation while walking around the site can be enough to identify a few things worth investigating.
Supplier contracts are another job for this week. Pull together the agreements for cleaning, security, pest control, maintenance and other regular services. Check what each one costs, when it renews and how much notice is needed to cancel. Missing a renewal date can leave the business paying for another year, even when the service isn’t particularly useful anymore.
Waste collection is worth checking too, especially if the facility handles deliveries, stock or packaging. How much waste does the site produce in a normal week? Is cardboard piling up near the loading area? Are collections happening often enough? Does the current arrangement still fit the operation? For businesses in Bedfordshire, looking at options such as waste management Luton may be part of reviewing local suppliers.
The point isn’t to change providers just because the property has changed hands. Find out what’s included in the existing contract first, and whether the service is doing what the business needs. While you’re reviewing suppliers, check their invoices against the agreements. If the charges don’t match, or there are additional fees nobody can explain, get those questions answered. It’s much easier to sort out billing discrepancies now than six months down the line.
Week Four: Decide What Actually Needs Doing
By the fourth week, there should be a clearer idea of the building’s condition and how much it costs to run. Some repairs will already be complete. Others will need quotes. There may be a few larger jobs that require proper planning before anyone commits to spending money.
Put everything in one place. A spreadsheet listing the problem, estimated cost, person responsible and next action is enough to get started. Deal with safety issues and anything that could disrupt operations first. Then look at overdue maintenance, recurring faults and contracts that need attention. The bigger improvements can wait until there’s enough information to make a sensible decision.
It’s also worth putting the numbers together. Review utility costs, supplier payments, outstanding maintenance bills and the repairs identified during the inspections. Keep some money aside for unexpected work, because there will probably be something that wasn’t obvious at the beginning.
Don’t assume every existing supplier needs replacing. A contractor who knows the building and responds quickly when equipment fails may be worth keeping. A new supplier isn’t automatically a better one, particularly if changing over means delays or extra costs.
What Should Be in Place After 30 Days?
By the end of the first month, the building doesn’t need to be completely sorted. There should, however, be a record of the outstanding repairs, the contracts that need reviewing and the costs that could affect the operating budget. Urgent problems should have clear next steps, and someone should be responsible for following them through. Some jobs will take longer than 30 days. What matters is that they’re no longer just things someone mentioned in passing or problems everyone assumes somebody else is dealing with.
Once the basics are under control, there’s a much better starting point for the next 90 days. And decisions about spending, maintenance and upgrades can be made with a clearer understanding of what the property actually needs.
short url: